Plans for a trail project are advancing, with a proposed route that could eventually stretch to Dairy Ashford. The project has been in development for years, with significant funding allocated to bring it to life. A total of $3.2 million has been set aside for the project.

The trail is expected to be 10 feet wide and have a concrete finish, with features such as access ramps and signage to ensure safety. Residents along the proposed route have mixed feelings about the project, but overall they are mostly optimistic.

Further details about the project's timeline and development are available from the source.